Pouring slab – floor 3
On 26.08.2021 a slab was poured on floor 3.
Pouring slab – floor 2
On 13.08.2021 a slab was poured on floor 2.
Pouring slab – floor 1
On July 15, 2021, a slab was poured on floor 1.
Educational Practice
Max Build hosted students from UACG.
Pouring slab – floor -1
On June 12, 2021, a slab was poured on floor -1 ground floor.
Pouring Foundations
On 15.05.2021 the foundations of the building were cast.
Completion
Video surveillance via phone or tablet to all cameras.
Two charging stations
Charging station for electric cars are installed on each level.
Prestressed Slab Structure
The safest, earthquake-resistant residential building.