Pouring slab – floor 3
On 26.08.2021 a slab was poured on floor 3.
Pouring slab – floor 2
On 13.08.2021 a slab was poured on floor 2.
Pouring slab – floor 1
On July 15, 2021, a slab was poured on floor 1.
Educational Practice
Max Build hosted students from UACG.
Pouring slab – floor -1
On June 12, 2021, a slab was poured on floor -1 ground floor.
Pouring Foundations
On 15.05.2021 the foundations of the building were cast.